All systems require a 4 wire 240v line to be installed. We also highly recommend using a GFCI breaker for added protection. All installations should be performed by a professional electrician. The 10-30gal Spike System requires a NEMA 14-30 and the 50gal requires a NEMA 14-50 outlet. 


The attached panel sheet discusses the electrical requirements further in detail.